Dedicated On-Site Condition Monitoring of High Voltage Power Cables up to 150kV

Edward Gulski, Delft University of Technology
Paul P. Seitz, Seitz Instruments AG
Ben Quak, Seitz Instruments AG
Frank Petzold, Seba KMT
Frank de Vries, Nuon Tecno

Abstract

For advanced, non-destructive on-site condition monitoring of HV power cables up to 150kV by partial discharge detection and dielectric losses measurement it is necessary to energize the disconnected cable system. One of the methods available for this purpose is based on applying damped AC voltages up to 150kV. In this paper, the use of modern technological solutions in power electronics and signal processing as well as in technical design and production methods will be discussed on the basis of the ultra light system (300kg) which is able to test cables up to 20km lengths.

Submitted: March 19, 2008 · Accepted: March 24, 2008 · Published: April 23, 2008

Recommended Citation

Gulski, Edward; Seitz, Paul P.; Quak, Ben; Petzold, Frank; and de Vries, Frank (2008) "Dedicated On-Site Condition Monitoring of High Voltage Power Cables up to 150kV," International Journal of Emerging Electric Power Systems: Vol. 9 : Iss. 3, Article 1.
Available at: http://www.bepress.com/ijeeps/vol9/iss3/art1

 
 
 
 

ISSN: 1553-779X ©1999-2008 The Berkeley Electronic Press™ All rights reserved.

To submit, subscribe, recommend this journal to your library, or sign up for email alerts, please visit: http://www.bepress.com/ijeeps