Wastewater Minimisation Using a Heuristic Procedure

Zhi-Yong Liu, Hebei University of Technology
Zisheng Jason Zhang, University of Ottawa
Linna Hu, Hebei University of Technology
Zhaoliang Wu, Hebei University of Technology

Abstract

A two-stage procedure is proposed for the minimisation of wastewater. In the first stage, heuristic rules are used to find the initial feasible flowsheet; in the second stage, the flow rates of streams in the initial flowsheet are determined by mass balance of the contaminants. The operations considered in this work include re-use, regeneration, mixing and bypassing of water streams. The proposed procedure is simple and the results of the examples studied are comparable with or better than those found in the literature.

Recommended Citation

Liu, Zhi-Yong; Zhang, Zisheng Jason; Hu, Linna; and Wu, Zhaoliang (2004) "Wastewater Minimisation Using a Heuristic Procedure," International Journal of Chemical Reactor Engineering: Vol. 2: A25.
Available at: http://www.bepress.com/ijcre/vol2/A25

 
 
 
 

ISSN: 1542-6580 ©1999-2009 The Berkeley Electronic Press™ All rights reserved.

To submit, subscribe, recommend this journal to your library, or sign up for email alerts, please visit: http://www.bepress.com/ijcre